
Commercial Pumping Systems
Continuous-duty fuel transfer pumps from 200 to 600+ litres per minute, with precision flow control and measurement, built for 24/7 operation.
200-600+ L/min
Flow capacity across the range
24/7
Continuous duty without performance degradation
Precision
Flow control and measurement
Sealed
Construction for harsh operating conditions
On this page
Tell us the litres per minute and the duty cycle. Flow rate drives everything.
Definition
Flow rate is the decision
Everything else about a commercial fuel pump follows from how fast it has to move fuel and how long it has to keep doing it. A depot filling twenty trucks at shift change has a different problem to a workshop filling one loader a day.
Undersize it and drivers queue. Oversize it and you pay for capacity and duty cycle you never use. The specification starts with litres per minute at peak, then adds the duty cycle the operation actually demands.
Measurement matters alongside flow. Accurate flow rate management means the fuel issued is the fuel recorded, which is what makes fuel accounting worth doing.
Sizing
Flow rates and what they suit
Three tiers, separated by flow and by how hard they can be worked.
| Flow rate | Build and use |
|---|---|
| 200 - 400 L/min | Standard commercial construction, continuous duty. Transport depots and medium-scale operations |
| 400 - 600 L/min | Heavy-duty, extended continuous operation. Manufacturing, large construction sites |
| 600+ L/min | Industrial-grade, maximum duty cycle. Fuel terminals and bulk distribution |
Construction
How it is built
Specified for continuous running rather than intermittent use.
| Construction | Industrial-grade materials for extended service life |
| Flow control | Accurate flow rate management and measurement |
| Duty cycle | Engineered for 24/7 operation |
| Sealing | Sealed construction for harsh industrial conditions |
| Monitoring | Performance tracking and maintenance scheduling |
| Safety | Emergency shut-off and operational safety features |

Process
Installation and ongoing support
Our engineers start by evaluating your site conditions and requirements, then the system is specified to those exact needs. Certified installers handle the setup, and everything is tested and commissioned before handover.
Every installation is handed over with complete compliance certificates and operating manuals, which is what keeps the site audit-ready and the installation insurance-compliant. Professional engineering certification is available where a site or an insurer asks for it.
After handover we run annual compliance inspections, preventive maintenance programmes, emergency repairs, and upgrade or modification work, through an Australia-wide service network.
Applications
Where it is used
Wherever fuel moves in volume, every day.
Frequently asked questions
Common questions about this product. If yours is not here, call us on 1300 210 480.


